Benissa construction · Costs & budget

A Benissa construction budget should explain the whole project.

A number is useful when you know what it includes, which decisions support it and where uncertainty remains. Build a cost plan you can keep updating.

Start with the intended result

Describe the home you want before requesting a meaningful estimate. Include the approximate scale, type of accommodation, design stage and outdoor works. A quote for a house structure answers a different question from a quote for a completed villa with kitchen, pool, garden and connections.

Keep early figures labelled as estimates. Record the drawings, assumptions and date behind each amount. As more information becomes available, update the cost plan rather than comparing the latest quote with an old figure whose scope is no longer clear.

Separate the cost headings

Part of the projectQuestions for your cost plan
Land and acquisitionWhich purchase-related expenses and advice are outside the construction budget?
Professional and technical workWho prices the design, surveys, reports, engineering and site oversight?
Site preparationWhat is assumed for access, excavation, disposal, ground preparation and retaining elements?
The houseWhich structure, envelope, installations, fixtures and finishes are included?
Pool and external worksAre terraces, pool equipment, drainage, boundaries and planting defined?
Connections and administrationWhich utilities, municipal items and project-specific completion costs need an allowance?
Owner purchases and reserveWhat furniture, equipment or upgrades sit outside the contract, and what reserve is retained?

Understand the land’s contribution to the price

Two plots can require different work before the same floor area becomes possible. Ask what information supports the allowances for groundworks, foundations, service routes and outdoor levels. Where a condition is not yet established, the estimate should make the assumption visible.

Compare the cost of achieving your intended result on each possible site. A purchase price alone does not tell you the likely construction implications. The plot comparison guide helps organise questions for the professionals assessing the land.

Read an area rate carefully

If you are given a price per square metre, ask which area definition is used and what the rate covers. Enclosed rooms, terraces, garages and other spaces may not be treated in the same way. The amount can only be compared when the measurement and included scope are understood.

Then ask what is excluded. Pools, retaining walls, landscaping, kitchen equipment or utility connections can materially affect the project without changing the quoted house area. This site does not assign a universal Benissa rate to an undefined specification; request current pricing for the actual proposal.

Compare offers using one information pack

Give each contractor the same drawings, scope schedule and product information. Ask for an itemised explanation of exclusions, provisional sums, owner-supplied items and assumptions. A lower total might reflect a genuinely different offer, or it might price fewer works.

  • Are tax treatment and any applicable charges clearly stated?
  • Which allowances are estimates rather than agreed fixed items?
  • Are kitchen, sanitaryware, glazing and joinery specifications comparable?
  • Is the pool quotation complete enough to include its relevant equipment and finishes?
  • Which external works and connections are included?
  • How long is the offer valid and what could change its price?

Agree the payment and change records

Ask how milestones will be evidenced and how payment requests relate to the contracted scope. Discuss the information that will accompany progress reports and invoices. Keep a written record of agreed variations, including the requested work, price, programme effect and approval.

When you choose a product above an allowance, update the forecast total immediately. Do the same when a scope item is removed. A useful cost plan reflects decisions as they happen, instead of allowing several small changes to emerge together at the end.

Protect the reserve for uncertainty

Discuss an appropriate contingency with your project team once the scope and risks are better understood. Keep it separate from planned optional upgrades. Ground information, unfinished selections and incomplete service details are different kinds of uncertainty and may need different investigation.

For a first review, share the plot location, available drawings, target use and the outdoor spaces you expect. Contact the First Estate team to identify which missing details would make the next estimate more reliable. The process guide shows where pricing connects to design, procurement and site decisions.